Age | Commit message (Expand) | Author |
2018-04-15 | Use existing code. Delay after delete....* Use existing code to get the elasticsearch connection. This should
prevent tests from failing in case the way connections to
elasticsearch are made change.
* Delay a while after deleting to allow elasticsearch to re-index the
data, thus preventing subtle bugs in the test.
| Muriithi Frederick Muriuki |
2018-04-13 | Fix logging in tests...* Use the LOG_LEVEL provided by the application settings to enable easy
control of logging when running tests. It helps avoid a lot of
verbosity when running tests.
| Muriithi Frederick Muriuki |
2018-02-19 | Create parametrized superclass for tests...* Since the tests require that some parameters be provided while running
the tests, create a class that helps abstract away the details of
retrieving and setting the expected parameters.
| Muriithi Frederick Muriuki |